Siddhirganj 335 MW combined-cycle Power Plant

Siddhirganj 335 MW combined-cycle Power Plant

The power plant, located in the industrial centre of Siddhirganj, about 20 km from the capital Dhaka, has state-of-the-art technology. It is configured in 1x1x1 multi-axis mode, with a General Electric (GE) 9FA gas turbine, fuelled by natural gas and a steam turbine, also from GE.
Cooling of the closed cycle is performed by cooling towers with previously treated water supply from the Sita Lakhya River, located approximately 1 km from the plant.
Siddhirganj 335 MW Combined Cycle Power Plant (CCPP) Project
Siddhirganj, Narayanganj
28th May 2012
27th Sep 2012
Natural Gas
N/A
EURO: 78,652,923 + USD: 196,098,772 + BDT: 2,795,081,706
Govt. of Bangladesh & The World Bank

JV of Isolux Ingenieria S.A and Samsung C&T Corporation, Spain
335 MW
EGCB Limited.
43,506.58 Lac Taka  Taka
309,998.81 Lac Taka  Taka
60,909.97 Lac taka  Taka
 